| Harris Rd SE | Closed | between | SE Lund Ave and SE Galeel Ct | 2/2/2026 | 2/28/2026 | Other - Put details in the comments | Road closed - Use detour or other alternate routes | West Sound Utility District has contractor, SEI, Inc., on site doing water line relocation in conjunction with upcoming County road project. Road is only to be closed to thru traffic 8:00am-5:00pm, with local access allowed. | South |
| Kingston ST NE | Restricted | between | Indianola Rd NE and NE Shore Dr | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brushing, Flaggers Present | North |
| Kitsap St NE | Restricted | between | Indianola Rd Ne and NE Shore Dr | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brushing, Flaggers Present | North |
| Madrona Dr SE | Restricted | | Full Length | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brushing, Weather Dependent, Flaggers Present | South |
| NE Helm St | Restricted | between | NE Fruitland St and Trenton Ave | 1/14/2026 | 2/28/2026 | Other - Put details in the comments | Moderate delays between 5 and 10 minutes | This work is a 2-part project and involves replacing a failing water main along portions of Fruitland St and Helm St. North Perry have experienced a history of main ruptures along Fruitland St, which has necessitated this work. The water main along Helm St is of the same age and material as the Fruitland St main, and for that reason is being replaced concurrently as part of the same project to avoid future failures. All construction activities will take place within the existing paved roadway surface, within the Kitsap County road right-of-way, and will not extend beyond right-of-way limits. To minimize stormwater runoff impacts - work will be intermittent depending on the weather. | Central |
| NE Parkway Street | Closed | | Entire length of county maintained | 8/19/2025 | 3/20/2026 | Construction | Road closed - Use detour or other alternate routes | | North |
| NW Clinton Ave | Restricted | between | NW Mulholland Blvd and Lofall Rd NW | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Ditching, Flaggers Present | North |
| NW Mulholland Blvd | Restricted | between | Lofall Rd NW and EOM | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Ditching, Flaggers Present | North |
| Ponderosa Dr SE | Restricted | | Full Length | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brushing, Weather Dependent, Flaggers Present | South |
| SE Lund Ave | Restricted | between | Hoover Ave SE and Chase Ave SE | 2/2/2026 | 2/28/2026 | Other - Put details in the comments | Moderate delays between 5 and 10 minutes | West Sound Utility District has contractor, SEI, Inc., on site doing work for water line relocation in conjunction with future County road project. | South |
| SE Mile Hill Dr | Restricted | between | Long Lake Rd SE and SE Southworth Dr | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Crack Sealing, Flaggers Present, Weather Dependent | South |
| SE Olympiad Dr | Closed | between | SE Southworth Dr and Inlet Ln SE | 2/2/2026 | 10/31/2026 | Construction | Road closed - Use detour or other alternate routes | Road closed to facilitate construction of Harper Estuary bridge. Detour routes will be posted. Visit http://kcowa.us/harper for project details | South |
| Tamsen Ave NW | Restricted | | Entire Length | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Ditching, Flaggers Present | North |
| Trenton Ave NE | Restricted | between | NE Stone Way and NE Sylvan Way | 2/9/2026 | 2/13/2026 | Maintenance | Moderate delays between 5 and 10 minutes | Overhead Brushing, Flaggers Present | Central |